601N II

As a part of the NCEEP Full Delivery Program, the 601N II project was constructed to produce mitigation credits for the NCDOT.  This project consisted of approximately 4,248 linear feet of Priority II stream restoration, with 33 log sill structures and 55 constructed riffles.  Reforestation of 11.7 AC is part of the project to restore stream buffer and natural habitats to the 12.3 AC conservation easement which were nonexistent as a result of farming operations.